Water Robust Cities
Closed · Netherlands
Source: Keep.EU
The climate change that is occurring directly affects the cities in our border region. They are increasingly confronted with flooding, water shortages, poor water quality and heat stress. Extreme precipitation occurred in 2010 (Achterhoek-Borken), 2014 (Münster) and 2017 (Rijssen-Twente). The very hot and dry summer of 2018 is another striking example. These weather extremes have far-reaching econ
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Rail, Manufacturing (Industrial)
- Location
- Netherlands
- Updated
- 22 Jul 2026
- Source
- Keep.EU
ConstructChat
Ask ConstructChat about Water Robust Cities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The climate change that is occurring directly affects the cities in our border region. They are increasingly confronted with flooding, water shortages, poor water quality and heat stress. Extreme precipitation occurred in 2010 (Achterhoek-Borken), 2014 (Münster) and 2017 (Rijssen-Twente). The very hot and dry summer of 2018 is another striking example. These weather extremes have far-reaching economic and social consequences for the inhabitants, businesses and users of the cities and lead to major spatial challenges for the city council. Adaptation to climate change will be one of the most important challenges facing the municipalities and cities in the Euregio in the coming decades. The cities of Zutphen and Hengelo (Ov.), Bocholt and Münster, and the water boards Rijn and IJssel and Vechtstromen, want to take up this challenge together. Through cross-border cooperation they will support each other in this, making use of each other's strengths to arrive at optimal solutions. The partners will work according to the 'multi-layer approach', which consists of: 1] preventing nuisance, 2] limiting nuisance and 3] acting in case of nuisance. A total of 12 measures will be developed and (partly) implemented in 3 work packages. This is done in dual-cooperation so that the partners can optimally support each other and learn from each other. In addition, a regular, joint knowledge exchange takes place, not only between the project partners themselves, but also with all the municipalities and cities in the Euregio. The experience, knowledge and insights from the project are combined in a manual, which is intended for all municipalities and cities in the Euregio and beyond, and thus also contributes to the EUREGIO 2030 Strategy. |
Budget |
Location
Country | Netherlands |
Source
Source reliability | Medium |
Source | Keep.EU |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Rail, Manufacturing (Industrial) |
Article published date | 2023-07-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
