Water Sanitary and Drainage Facilities
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
The work consists of providing the necessary labor, materials, equipment, supervision, and plant to Construction of Water, Sanitary, and Drainage Facilities in Sunterra Sec 76 and Sec 77 for Waller County Municipal Utility District No. 35, Waller County, Texas.
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Sanitary and Drainage Facilities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of providing the necessary labor, materials, equipment, supervision, and plant to Construction of Water, Sanitary, and Drainage Facilities in Sunterra Sec 76 and Sec 77 for Waller County Municipal Utility District No. 35, Waller County, Texas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
