Water Sector Round 2 Sewer Improvements
Sector: Water Supply and Storage • Location: Hammond, Louisiana, United States of America
Source: Dodge USA
Construction of a new duplex submersible sanitary sewerage pump station (Highway 51 LS) with 10' diam. precast concr. wet well (21.0VF), new 6' diam. valve pit (6.0VF), 6'H fence (200LF)(including gates); 1 upgraded sanitary sewerage pump station (Patti Road LS) with new pumping equipment, both lift stations to include new pumping equipment/accessories, electrical work & controls, yard piping, val
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial
- Location
- Hammond, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Sector Round 2 Sewer Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new duplex submersible sanitary sewerage pump station (Highway 51 LS) with 10' diam. precast concr. wet well (21.0VF), new 6' diam. valve pit (6.0VF), 6'H fence (200LF)(including gates); 1 upgraded sanitary sewerage pump station (Patti Road LS) with new pumping equipment, both lift stations to include new pumping equipment/accessories, electrical work & controls, yard piping, valves, and fittings (as required); about 5,600LF of 8" force main (Highway 51 LS to US Highway 51 t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Hammond |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
