WATER SUPPLY & SEWERAGE
Closed · Portugal
Source: World Bank Group
The project would increase the production of potable water and improve the water distribution system of the Lisbon region. It would also assist the Government in water sector reorganization and in design and planning capability. It consists of: (a) construction of a pipeline from the Castelo de Bode reservoir to the Lisbon region and related pumping and treatment facilities; (b) expansion of the L
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Portugal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY & SEWERAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would increase the production of potable water and improve the water distribution system of the Lisbon region. It would also assist the Government in water sector reorganization and in design and planning capability. It consists of: (a) construction of a pipeline from the Castelo de Bode reservoir to the Lisbon region and related pumping and treatment facilities; (b) expansion of the Lisbon region water distribution system and (c) studies for the regionalization of sanitary services in the Lisbon area and water supply and sewerage feasibility studies in the Porto and Alxarve regions; and short period training abroad for DGSB and EPAL senior staff. The beneficiaries would be 2.6 million people in the Lisbon region, currently including some 300,000 urban poor. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Portugal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
