logo

Water supply and wastewater disposal BiH II

Sector: Government • Location: Bosnia and Herzegovina

Source: KFW Bank aus Verantwortung

Project
Completed

The program is intended to help sustainably secure or improve the living conditions of the population in the two Bosnian cities of Tuzla and Zenica (FC program objective). The FC measure objective is to ensure a reliable and hygienically safe drinking water supply for the population in the program communities at cost-covering and socially acceptable prices. The investment measures required to achi

Project Information FAQ

Project Information

5 Q
The project “Water supply and wastewater disposal BiH II” is an infrastructure initiative in the Government sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The program is intended to help sustainably secure or improve the living conditions of the population in the two Bosnian cities of Tuzla and Zenica (FC program objective). The FC measure objective is to ensure a reliable and hygienically safe drinking water supply for the population in the program communities at cost-covering and socially acceptable prices. The investment measures required to achieve the objectives focus on the rehabilitation and expansion of the existing water supply systems. The utility companies are to be institutionally supported by an accompanying measure in order to ensure the financial and technical sustainability of the investments. The target group are the residents of the program communities connected to the central supply network and, through the accompanying measure, also the municipal utilities and municipal administrations responsible for the water supply. The total cost of the program is estimated at EUR 22.86 million. Half of the costs for the investments and for the implementation consultant will be financed through a low-interest loan of EUR 11.0 million and half through a grant from SECO of EUR 9.49 million. There will also be an accompanying measure of EUR 1.5 million. Following the flood disaster in Bosnia and Herzegovina in May 2014, the Swiss government, through the State Secretariat for Economic Affairs (SECO), is providing an additional financial contribution of EUR 2.375 million to rebuild damaged infrastructure of the water supply and sewage disposal systems as well as disaster prevention in the program cities of Tuzla and Zenica (flood measures). The funds will be pledged by KfW as a mandate and implemented as part of the existing project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data