Water supply and water-infrastructure development in the boundary catchment areas
Sector: Commercial • Location: Serbia
Source: Keep.EU
LB:Between the 18+800 - 19+331 km cross-sections parallel with the Domaszéki main canal, an 531 meters long DN 900 HOBAS pressure pipe will be built. In the 19+331 km cross-section a stilling basin and shutter weir will be built. Delivering of the w ater from the pressure pipe will be accomplished between 19+331- 20+580 km sections of Domaszéki main canal.There will be sediment dredging along 1.24
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | LB:Between the 18+800 - 19+331 km cross-sections parallel with the Domaszéki main canal, an 531 meters long DN 900 HOBAS pressure pipe will be built. In the 19+331 km cross-section a stilling basin and shutter weir will be built. Delivering of the w ater from the pressure pipe will be accomplished between 19+331- 20+580 km sections of Domaszéki main canal.There will be sediment dredging along 1.249 meters long and reducing of the canal bottom by 50 cm. A new regulation structure will be built in 20+445 km cross-section of Domaszéki main canal. Between the 20+580 – 23+996 km cross-sections of the Domaszéki main canal will be rebuilt to dual-purpose channel.There will be dredging, implementation of canal levee, reconstruction of water retenti on works. Within this section new pumping station will be built (Ivánszéki pump station 20+580 km). We are building a monitoring system to prevent droughts and water shortages that will be able to measure the hydrological conditions in the area. B1: The local waste management plant will increase its capacities. That will be achieved with reconstruction, repurposing and construction of new facilities and purchase of new, efficient equipment. Thus the population will have high quality drinking wat er B2: Flood prevention and protection against it is a complex activity, where the main professional techniques and supplies need to be shared between water management authorities for better outcomes on both sides of the border. On the Serbian side, a new protection technique and relevant training will be implemented among professionals and volunteers from both countries. The aim of the present project is to improve technical and personal resources for flood prevention on both sides of the borde r through joint actions and procurement of tube barrier for flood protection. Tube barrier for emergency flood protection is a quick, lightweight and highly effective alternative and it is easily transferable between countries if needed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
