logo

Water supply and water-infrastructure development in the boundary catchment areas

Sector: Commercial • Location: Serbia

Source: Keep.EU

Project
Closed

LB:Between the 18+800 - 19+331 km cross-sections parallel with the Domaszéki main canal, an 531 meters long DN 900 HOBAS pressure pipe will be built. In the 19+331 km cross-section a stilling basin and shutter weir will be built. Delivering of the w ater from the pressure pipe will be accomplished between 19+331- 20+580 km sections of Domaszéki main canal.There will be sediment dredging along 1.24

Project Information FAQ

Project Information

5 Q
The project “Water supply and water-infrastructure development in the boundary catchment areas” is an infrastructure initiative in the Commercial sector, located in Serbia. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

LB:Between the 18+800 - 19+331 km cross-sections parallel with the Domaszéki main canal, an 531 meters long DN 900 HOBAS pressure pipe will be built. In the 19+331 km cross-section a stilling basin and shutter weir will be built. Delivering of the w ater from the pressure pipe will be accomplished between 19+331- 20+580 km sections of Domaszéki main canal.There will be sediment dredging along 1.249 meters long and reducing of the canal bottom by 50 cm. A new regulation structure will be built in 20+445 km cross-section of Domaszéki main canal. Between the 20+580 – 23+996 km cross-sections of the Domaszéki main canal will be rebuilt to dual-purpose channel.There will be dredging, implementation of canal levee, reconstruction of water retenti on works. Within this section new pumping station will be built (Ivánszéki pump station 20+580 km). We are building a monitoring system to prevent droughts and water shortages that will be able to measure the hydrological conditions in the area. B1: The local waste management plant will increase its capacities. That will be achieved with reconstruction, repurposing and construction of new facilities and purchase of new, efficient equipment. Thus the population will have high quality drinking wat er B2: Flood prevention and protection against it is a complex activity, where the main professional techniques and supplies need to be shared between water management authorities for better outcomes on both sides of the border. On the Serbian side, a new protection technique and relevant training will be implemented among professionals and volunteers from both countries. The aim of the present project is to improve technical and personal resources for flood prevention on both sides of the borde r through joint actions and procurement of tube barrier for flood protection. Tube barrier for emergency flood protection is a quick, lightweight and highly effective alternative and it is easily transferable between countries if needed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data