WATER SUPPLY I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project includes: (i) Pozos Sur: a 30-unit well field located 15 km south of the city center and linked to the distribution system by a 1.22 m diameter conduit; (ii) Guadalupe: a surface water scheme which would draw water from the existing irrigation dam on Cuautitlan River at Guadalupe, and treat and transmit it to two service reservoirs; (iii) Cuautitlan: expansion of an existing well field
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: (i) Pozos Sur: a 30-unit well field located 15 km south of the city center and linked to the distribution system by a 1.22 m diameter conduit; (ii) Guadalupe: a surface water scheme which would draw water from the existing irrigation dam on Cuautitlan River at Guadalupe, and treat and transmit it to two service reservoirs; (iii) Cuautitlan: expansion of an existing well field located 35 km north of the city and a 1.83 m diameter conduit to convey the water to the metropolitan area; (iv) Los Reyes: a well field with a 1.83 m diameter conduit to the metropolitan area; (v) Apan: a well field with a 2.40 m diameter conduit to the metropolitan area and a second stage expansion of this field to be built after the Project is completed, with adequate transmission capacity provided for it under the first stage; (vi) Texcoco: a multipurpose scheme to produce groundwater for water supply, treat wastewater for agricultural and industrial use; provide treated wastewater for a 4,000 ha irrigation zone; extract industrial quality salt from saline waters; regulate surface waters; reclaim 6,000 ha of land through afforestation and develop a 500 ha urban zone; (vii) Social Public Works: Attached to each of the above sub-projects are certain public works. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Samalayuca II CCGT Plant Chihuahua Mexico
- Tuxtla Gutierrez Wastewater Treatment Plant - Phase I
- Lerdo Wastewater Treatment Plant
- Cancun Recycling & Waste Processing Plant
- SSA Car Terminal Lazaro Cardenas
- Veracruz and Medellin Water and Sewerage Services
- Tuxpan Container Terminal
