WATER SUPPLY II
Sector: Water Supply and Storage • Location: Morocco
Source: World Bank Group
The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along the existing transmission pipeline, a raw water pumping station with a capacity of 5 m3/sec., a 2.83 km pressure main linking the pumping station at the foot of the Bou Regreg dam with the treatment plant, a 5 m3/sec. treatment plant, a 2 km transmission main to Rabat, and an 82 km transmission main to Casablanca; (ii) the expansion of bulk water production and transmission facilities for the Greater Agadir area. This component will include: (a) equipping the existing Ahmar Boudhar well field with pumps and ancillary equipment; (b) constructing a transmission pipeline to Agadir and a treatment plant at Sidi Bou Shab; and (c) installing power transmission lines to the well field and the treatment station; (iii) funds for credit facilities to finance house connections of the low-income population in the project area; and (iv) studies. The implementation of the project does not pose any special risks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
