logo
ProjectClosed

WATER SUPPLY II

One of 4,331 projects Taiyo tracks in Morocco.

Source: World Bank Group

The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along t

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Government
Location
Morocco
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WATER SUPPLY II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WATER SUPPLY II” is an infrastructure initiative in the Water Supply and Storage sector, located in Morocco. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along the existing transmission pipeline, a raw water pumping station with a capacity of 5 m3/sec., a 2.83 km pressure main linking the pumping station at the foot of the Bou Regreg dam with the treatment plant, a 5 m3/sec. treatment plant, a 2 km transmission main to Rabat, and an 82 km transmission main to Casablanca; (ii) the expansion of bulk water production and transmission facilities for the Greater Agadir area. This component will include: (a) equipping the existing Ahmar Boudhar well field with pumps and ancillary equipment; (b) constructing a transmission pipeline to Agadir and a treatment plant at Sidi Bou Shab; and (c) installing power transmission lines to the well field and the treatment station; (iii) funds for credit facilities to finance house connections of the low-income population in the project area; and (iv) studies. The implementation of the project does not pose any special risks.

Original sector

Water, Sanitation and Waste Management

Location

Country

Morocco

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project