WATER SUPPLY II
One of 4,331 projects Taiyo tracks in Morocco.
Source: World Bank Group
The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along t
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Government
- Location
- Morocco
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along the existing transmission pipeline, a raw water pumping station with a capacity of 5 m3/sec., a 2.83 km pressure main linking the pumping station at the foot of the Bou Regreg dam with the treatment plant, a 5 m3/sec. treatment plant, a 2 km transmission main to Rabat, and an 82 km transmission main to Casablanca; (ii) the expansion of bulk water production and transmission facilities for the Greater Agadir area. This component will include: (a) equipping the existing Ahmar Boudhar well field with pumps and ancillary equipment; (b) constructing a transmission pipeline to Agadir and a treatment plant at Sidi Bou Shab; and (c) installing power transmission lines to the well field and the treatment station; (iii) funds for credit facilities to finance house connections of the low-income population in the project area; and (iv) studies. The implementation of the project does not pose any special risks. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Morocco |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Morocco
- Tangier city waste treatment services
- Meknes waste landfill and recycling facility
- Redal S.A. and Amendis S.A.
- Morocco - Drinking Water Quality and Service Improvement Project
- Morocco - Project to Update the Drinking Water Supply in the Rabat-Casablanca Coastal Area
- RECHARGE DE LA NAPPE DU HAOUZ
- The Tangiers Med 2 container port
- ADWEA - Jorf Lasfar IPP
