logo

WATER SUPPLY II

Sector: Water Supply and Storage • Location: Morocco

Source: World Bank Group

Project
Closed

The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along t

Project Information FAQ

Project Information

5 Q
The project “WATER SUPPLY II” is an infrastructure initiative in the Water Supply and Storage sector, located in Morocco. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The primary objective of the Second Water Supply Project for Morocco is to improve access to safe water supplies to the population of the Mid-Atlantic Coast and the Greater Agadir area. It consists of: (i) the expansion of bulk water production and transmission facilities along the Mid-Atlantic Coast. These additional facilities will include the construction of two booster pumping stations along the existing transmission pipeline, a raw water pumping station with a capacity of 5 m3/sec., a 2.83 km pressure main linking the pumping station at the foot of the Bou Regreg dam with the treatment plant, a 5 m3/sec. treatment plant, a 2 km transmission main to Rabat, and an 82 km transmission main to Casablanca; (ii) the expansion of bulk water production and transmission facilities for the Greater Agadir area. This component will include: (a) equipping the existing Ahmar Boudhar well field with pumps and ancillary equipment; (b) constructing a transmission pipeline to Agadir and a treatment plant at Sidi Bou Shab; and (c) installing power transmission lines to the well field and the treatment station; (iii) funds for credit facilities to finance house connections of the low-income population in the project area; and (iv) studies. The implementation of the project does not pose any special risks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data