WATER SUPPLY II
Sector: Water Supply and Storage • Location: Congo, Democratic Republic of
Source: World Bank Group
This report appraises the first Bank Group Water Supply Project in Zaire. In 1973/74, in the framework of the World Health Organization (WHO)/International Bank for Reconstruction and Development (IBRD) cooperative program, WHO carried out a study of the water supply, sewerage and drainage sector. The study revealed enormous needs in the sector, and recommended a substantial and continuous develop
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This report appraises the first Bank Group Water Supply Project in Zaire. In 1973/74, in the framework of the World Health Organization (WHO)/International Bank for Reconstruction and Development (IBRD) cooperative program, WHO carried out a study of the water supply, sewerage and drainage sector. The study revealed enormous needs in the sector, and recommended a substantial and continuous development program, starting with water supply in the major cities, as well as a comprehensive training program to upgrade and augment the technical staff of the National Water Supply Corporation, Regideso. The project represents a first stage in the implementation of the sector study recommendations. The project will improve the supply of water in six of the major cities of Zaire: Lubumbashi, Kisangani, Kananga, Mbuji-Mayi, Mbandaka and Kamina, whose aggregate population is estimated at 1.5 million, out of a total urban population of about 6 million. The project will provide water to 0.7 to 1 million additional people the majority of who fall in the category of the urban poor. The feasibility studies were carried out by two consultants engaged and paid for by Regideso. Production facilities will be rehabilitated and supplemented to provide continuous service, and distribution systems will be expanded to supply the entire urbanized area of the six cities; at present only about one-third of their population has access to piped water. Distribution is to be expanded primarily through standpipes. The project has been sized to assure the supply of water to the whole population of the six-cities by 1980. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
