WATER SUPPLY II
Sector: Water Supply and Storage • Location: Uganda
Source: World Bank Group
The project is part of an urban water program with a combination of economic, social, environmental and institutional objectives, specifically: a) improving public health; b) enabling increased production of goods and services; c) preventing environmental pollution; and d) easing women's burden by expanding and improving water supply systems and waste water treatment facilities. The project will
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is part of an urban water program with a combination of economic, social, environmental and institutional objectives, specifically: a) improving public health; b) enabling increased production of goods and services; c) preventing environmental pollution; and d) easing women's burden by expanding and improving water supply systems and waste water treatment facilities. The project will include physical and institutional components for the expansion of water supply facilities in five towns, strengthening NWSC, and improving water supply legislation. The physical components comprise the following : 1) expansion and improvement of water supply and rehabilitation of sewerage facilities in Kampala, Jinja, Masaka, Mbara,and Mbale; 2) reduction of water wastage through leak detection, repair of the distribution system, and installation of water meters in order to stop consumer waste. The institutional components are the following : i) strengthening of NWSC's finance, operation and maintenance capacity through technical assistance and training; ii) continuation of customer surveys and introduction of computerized billing procedures; and iii) introduction of a streamlined legal and institutional framework for the water sector, including pollution control. |
Original sector | FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | Uganda |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uganda
- Isimba Hydropower Project
- New Bridge across River Nile at Jinja
- Kasese Electrification Project
- Uganda - Feasibility Studies and Detailed Designs for Faecal Sludge Service Chain Management in Un-Sewered Urban Centers in Uganda
- Uganda - Road Sector Support Project V
- BUJAGALI HYDROELECTRIC PROJECT
- Kyoga Ltd.
- Karuma Hydropower Plant
