Water Supply Intake Replacement
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
Project consists of a floating intake in the town of Comfort Cove-Newstead. The scope of the project includes installing a floating intake in 20-30’ of water to avoid the intake from sitting on the bottom of the pond. This project will prevent the dirty water problem during the Spring/Summer season while the fish plant is running and residents will still have full use of their water.
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water Supply Intake Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of a floating intake in the town of Comfort Cove-Newstead. The scope of the project includes installing a floating intake in 20-30’ of water to avoid the intake from sitting on the bottom of the pond. This project will prevent the dirty water problem during the Spring/Summer season while the fish plant is running and residents will still have full use of their water. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
