WATER SUPPLY IV
Sector: Water Supply and Storage • Location: Tunisia
Source: World Bank Group
The Fourth Water Supply Project for Tunisia provides for the construction of facilities to meet the potable water needs of the governorates of Tunis, Tunis-Sud, Beja, Jendouba, and Nebeul to the year 1990; and technical assistance. The four major components are: (i) production facilities including the Saida dam-reservoir, two pumping stations, transmission pipelines and a water treatment plant; (i
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment, Hydro, Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WATER SUPPLY IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Fourth Water Supply Project for Tunisia provides for the construction of facilities to meet the potable water needs of the governorates of Tunis, Tunis-Sud, Beja, Jendouba, and Nebeul to the year 1990; and technical assistance. The four major components are: (i) production facilities including the Saida dam-reservoir, two pumping stations, transmission pipelines and a water treatment plant; (ii) extension of the distribution system in greater Tunis including installation of two primary mains, the expansion and improvement of the secondary distribution network and upgrading of booster pumping stations; (iii) the extension of distribution systems including expansion of the primary systems, improvement of the secondary distribution networks and upgrading of storage and booster pumping in Beja, Medjez-el-Bab, Pont du Fahs, and South Nabeul; and (iv) study to assist Societe Nationale d'Exploitation et de Distribution des Eaux (SONEDE) in developing and adapting its management structures (including its computer and information systems) in accordance with the needs of its future expansion. The loan will finance the total foreign exchange cost of the production component. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Tunisia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
