logo

Water Supply Plant No. 1 - Phase 1

Sector: Commercial • Location: Magnolia, Texas, United States of America

Source: Dodge USA

Project
Closed

Water Supply Plant No. 1 - Phase 1 to Serve Magnolia Woods Municipal Utility District No. 1 Scope of Work of the Contract Documents includes the following: This project includes two wells, and 87 foot tall ground storage tank, horizontal split case booster pumps, a hydro pneumatics tank, a chemical/control/booster pump building and all appurtenances.

Status
Closed
Sector
Commercial, Water Supply and Storage, Chemical (Industrial), Hydro, Power Transmission, Government, Residential, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
Location
Magnolia, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Supply Plant No. 1 - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Supply Plant No. 1 - Phase 1” is an infrastructure initiative in the Commercial sector, located in Magnolia, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Water Supply Plant No. 1 - Phase 1 to Serve Magnolia Woods Municipal Utility District No. 1 Scope of Work of the Contract Documents includes the following: This project includes two wells, and 87 foot tall ground storage tank, horizontal split case booster pumps, a hydro pneumatics tank, a chemical/control/booster pump building and all appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Magnolia

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Chemical (Industrial), Hydro, Power Transmission, Government, Residential, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project