logo

WATER SUPPLY SANAA

Sector: Water Supply and Storage • Location: Yemen, Republic of

Source: World Bank Group

Project
Closed

The First Sana Water Supply Project will include the following: (a) Well field. Eight production wells producing about 200 litres/second, with associated pumps, pump houses, power supply and transmission pipeline; (b) Transmission line. A 5.6 km pipeline to convey the water from the well fields to the headworks; (c) Headworks. One 4500 cubic meters chlorination/regulation tank on a hill northwest

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Residential
Location
Yemen
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WATER SUPPLY SANAA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WATER SUPPLY SANAA” is an infrastructure initiative in the Water Supply and Storage sector, located in Yemen, Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The First Sana Water Supply Project will include the following: (a) Well field. Eight production wells producing about 200 litres/second, with associated pumps, pump houses, power supply and transmission pipeline; (b) Transmission line. A 5.6 km pipeline to convey the water from the well fields to the headworks; (c) Headworks. One 4500 cubic meters chlorination/regulation tank on a hill northwest of Sana'a; two pumps (150 1/sec. each) and three air tanks (4.5 cubic meters each); pumphouse; (d) Distribution System. 17 km of main lines (200 mm to 600 mm), 175 km of distribution lines (80 mm to 150 mm) and about 6000 house connections; (e) Operation and Maintenance Equipment; (f) Technical Assistance. Consultants for supervision of construction, tariff and accounting system development, and operation of the water supply system; (g) Training. About 40 man months of overseas training for senior staff and local training for skilled labor and office personnel; (h) Consultants' Services for preparation of final engineering of, and tender documents for, a water supply project in Hodeida, and for assisting in the analysis of bids and contract award.

Original sector

Water, Sanitation and Waste Management

Location

Country

Yemen

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project