Water Supply System Pipeline Upgrade
Sector: Water Supply and Storage • Location: Saskatchewan, Canada
Source: Infrastructure Canada
Objective: Improve capacity and reliability of raw water supply system to meet demands of new water plant. Scope: Plan, design and construct approximately two approximately 75 mm diameter raw water supply lines each approximately 1360 m length, and all associated works. Output: Upgraded raw water supply system.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water Supply System Pipeline Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Objective: Improve capacity and reliability of raw water supply system to meet demands of new water plant. Scope: Plan, design and construct approximately two approximately 75 mm diameter raw water supply lines each approximately 1360 m length, and all associated works. Output: Upgraded raw water supply system. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
