Water System - Section V REBID
Sector: Water Supply and Storage • Location: Papillion, Nebraska, United States of America
Source: Dodge
Description Quantity Unit1. Construct 8 D.i.p., Cl 350 Water Main 4,423 Lf 2. Bore 8 D.i.p., Cl 350 Water Main 90 Lf 3. Install 8 Gate Valve And Box 9 Ea 4. Install 8 X 8 Tee 2 Ea 5. Construct Fire Hydrant Assembly-american-darling, 5 1/4, B-84-b-5 2 Ea 6. Connection To Existing Main 6 Ea 7. Relocate Existing Hydrant 6 Ea
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Papillion, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water System - Section V REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description Quantity Unit1. Construct 8 D.i.p., Cl 350 Water Main 4,423 Lf 2. Bore 8 D.i.p., Cl 350 Water Main 90 Lf 3. Install 8 Gate Valve And Box 9 Ea 4. Install 8 X 8 Tee 2 Ea 5. Construct Fire Hydrant Assembly-american-darling, 5 1/4, B-84-b-5 2 Ea 6. Connection To Existing Main 6 Ea 7. Relocate Existing Hydrant 6 Ea |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Papillion |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
