logo

Water System Capital Improvement Plan Phase 3

Sector: Waste Processing and Treatment • Location: Keller, Texas, United States of America

Source: Dodge

Project
Bid Results

This Project consists of: 1. 178 LF of 6 water line by open cut. 2. 1677 LF of 8 water line by open cut. 3. 2797 LF of 12 water line by open cut. 4. 140 LF of 8 water line by uncased bore (Alternate Bid) 5. 140 LF of 8 water line by cased bore. 6. 978 LF of 8 water line by pipe bursting. 7. Temporary water line and service connections. 8. Asphalt and concrete pavement repair. 9. Traditional mill &

Status
Closed
Sector
Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government, Manufacturing (Industrial)
Location
Keller, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Water System Capital Improvement Plan Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water System Capital Improvement Plan Phase 3” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Keller, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Project consists of: 1. 178 LF of 6 water line by open cut. 2. 1677 LF of 8 water line by open cut. 3. 2797 LF of 12 water line by open cut. 4. 140 LF of 8 water line by uncased bore (Alternate Bid) 5. 140 LF of 8 water line by cased bore. 6. 978 LF of 8 water line by pipe bursting. 7. Temporary water line and service connections. 8. Asphalt and concrete pavement repair. 9. Traditional mill & overlay operations

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Keller

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government, Manufacturing (Industrial)

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project