Water System Improvement Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Work for thislocation consists of, but is not limited to a water main replacement projectwhich includes clearing and grubbing, maintenance of traffic, open cutinstallation of 6, 8 and 10 ductile iron water main pipe, installation of 8and 10 High Density Polyethylene HDPE pipe by the directional drill method,installation of valves, fittings and fire hydrants, replacement of 2 waterservice pipe
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Education, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Sunrise, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work for thislocation consists of, but is not limited to a water main replacement projectwhich includes clearing and grubbing, maintenance of traffic, open cutinstallation of 6, 8 and 10 ductile iron water main pipe, installation of 8and 10 High Density Polyethylene HDPE pipe by the directional drill method,installation of valves, fittings and fire hydrants, replacement of 2 waterservice pipe with HDPE pipe by open cut and pipe bursting, replacement of watermeters and assemblies, connecti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sunrise |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Education, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
