Water System Improvement Section 3 Rural Water Connection
Sector: Water Supply and Storage • Location: Jamaica, Iowa, United States of America
Source: Dodge USA
Water Transmission Pipelines, Water Utilities, Directional Drilling, Directional Bore . Section 3 Rural Water Connection (December 2024, Substantial Completion) 1. Construction of approximately 3,100 feet of new 4 water main and appurtenances from the existing Xenia Rural Water District water main, located north of HWY 141, with a stub on the northwest corner of HWY 141 and Wink Ave. (P30), to a c
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Jamaica, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvement Section 3 Rural Water Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water Transmission Pipelines, Water Utilities, Directional Drilling, Directional Bore . Section 3 Rural Water Connection (December 2024, Substantial Completion) 1. Construction of approximately 3,100 feet of new 4 water main and appurtenances from the existing Xenia Rural Water District water main, located north of HWY 141, with a stub on the northwest corner of HWY 141 and Wink Ave. (P30), to a connection point on the existing water treatment plant property, located southwest of the intersec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Jamaica |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
