Water System Improvements - Contract #1
Bid results · New Hampshire · Last reported Dec 2024
Source: Dodge USA
Approximately 4,800 LF of new 12-inch DI water main on Route 153 as well as ancillary work: o ~ 350 LF of new 8-inch DI water main. o ~ 160 LF of new 6-inch DI water main. New 8-inch stub to Cemetery Road. 20 utility poles to be relocated. 2 new poles to be installed. Eversource and Consolidated have been contacted. 45 service connections to curb stop. Night work to be done at the following locati
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- Farmington, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvements - Contract 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximately 4,800 LF of new 12-inch DI water main on Route 153 as well as ancillary work: o ~ 350 LF of new 8-inch DI water main. o ~ 160 LF of new 6-inch DI water main. New 8-inch stub to Cemetery Road. 20 utility poles to be relocated. 2 new poles to be installed. Eversource and Consolidated have been contacted. 45 service connections to curb stop. Night work to be done at the following locations to minimize disruption: o Connection to existing 8-inch CI water main if Add Alt #1 is not aw... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Farmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project