logo
ProjectBidding

Water System Improvements Phase 1

Bidding · Kansas · Last reported Dec 2024

Source: Dodge USA

Work includes furnishing all the labor, materials, and equipment for constructing approximately 3,050 linear feet of 6-inch waterline; 260 linear feet of 4-inch waterline; 547 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipelin

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
Location
Republic, Kansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water System Improvements Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water System Improvements Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Republic, Kansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work includes furnishing all the labor, materials, and equipment for constructing approximately 3,050 linear feet of 6-inch waterline; 260 linear feet of 4-inch waterline; 547 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appu...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Republic

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Government

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project