Water System Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Schedule 1 - 4,370 lineal feet (LF) of 12" C900 DR18 PVC water mains; 3,092 LF of 8" C900 DR18 PVC water mains; 2,150 LF of 6" C900 DR18 PVC water mains; 112 LF of 4" C900 DR18 PVC water mains; 880 LF of 24" steel bore and jack with 12" C900 DR18 PVC carrier pipe; 80 LF of 12" steel bore and jack with 6" C900 DR18 PVC carrier pipe; 200 LF of 12" high density polyethylene utilizing directional dril
- Status
- Closed
- Sector
- Steel, Water Supply and Storage, Chemical (Industrial), Power Transmission, Government, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Byers, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Schedule 1 - 4,370 lineal feet (LF) of 12" C900 DR18 PVC water mains; 3,092 LF of 8" C900 DR18 PVC water mains; 2,150 LF of 6" C900 DR18 PVC water mains; 112 LF of 4" C900 DR18 PVC water mains; 880 LF of 24" steel bore and jack with 12" C900 DR18 PVC carrier pipe; 80 LF of 12" steel bore and jack with 6" C900 DR18 PVC carrier pipe; 200 LF of 12" high density polyethylene utilizing directional drilling methods; 5-12", 6-8", 21-6" and 7-4" valves and riser boxes; 9 fire hydrant assemblies; 27 c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Byers |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage, Chemical (Industrial), Power Transmission, Government, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
