Water System Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Water System Improvements consisting of 12 3 and 4 MJ Gate Valves, 11 2 Flush Hydrant Settings, removing and replacing existing water meters with new radio read water meters, installing water meter settings, installing area meter settings, installing pressure transducer pit, exterior and interior standpipe coating systems, standpipe rehabilitation, Well No. 1 chlorination building rehabilitation,
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Gorham, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water System Improvements consisting of 12 3 and 4 MJ Gate Valves, 11 2 Flush Hydrant Settings, removing and replacing existing water meters with new radio read water meters, installing water meter settings, installing area meter settings, installing pressure transducer pit, exterior and interior standpipe coating systems, standpipe rehabilitation, Well No. 1 chlorination building rehabilitation, Well No. 1 and Well No. 3 electrical improvements, new standby generator, and miscellaneous appur... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Gorham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
