Water System Improvements
Sector: Water Supply and Storage • Location: Grand Rapids, Michigan, United States of America
Source: Dodge USA
This work consists of removal of 4 valve chambers, the construction of 1 flow meter manhole, 1 pressure reducing valve (PRV) chamber, 1 PRV manhole, and 1 PRV chamber renovation, 20 feet of 6 inch, 50 ft. of 8 inch, 335 ft. of 12 inch, and 20 ft. of 30 inch water main with valves and fittings, 100 ft. of 4 inch DI Cl53 storm sewer, 1 storm manhole, 2 infiltration basins, curb and gutter removal an
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Grand Rapids, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work consists of removal of 4 valve chambers, the construction of 1 flow meter manhole, 1 pressure reducing valve (PRV) chamber, 1 PRV manhole, and 1 PRV chamber renovation, 20 feet of 6 inch, 50 ft. of 8 inch, 335 ft. of 12 inch, and 20 ft. of 30 inch water main with valves and fittings, 100 ft. of 4 inch DI Cl53 storm sewer, 1 storm manhole, 2 infiltration basins, curb and gutter removal and replacement, concrete pavement removal and replacement, sidewalk removal and replacement includ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grand Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
