Water System Improvements
Sector: Chemical (Industrial) • Location: Steele, Missouri, United States of America
Source: Dodge USA
The Project generally includes three contracts involving the following: Contract 1- water distribution system replacement with approximately 52,384 feet of 4-inch through 8-inch waterlines, fire/flush hydrants, gate valves, and tie-ins to existing system Contract 2 Treatment plant and Well #2 rehabilitation including the well discharge piping, chlorine room, filter valves, filter piping, head tank
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project generally includes three contracts involving the following: Contract 1- water distribution system replacement with approximately 52,384 feet of 4-inch through 8-inch waterlines, fire/flush hydrants, gate valves, and tie-ins to existing system Contract 2 Treatment plant and Well #2 rehabilitation including the well discharge piping, chlorine room, filter valves, filter piping, head tank coating, controls, metering, chemical feed equipment, electrical, and all accessories. Properly ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- William Pond Chemical Toilet Replacement
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- Diet-Induced Changes in Inflammation as Determinants of Colon Cancer (R01)
