Water System Improvements
Sector: Metal • Location: Benton Harbor, Michigan, United States of America
Source: Dodge USA
The project primarily consists of furnishing all material and constructing the following approximate quantities: 1,600' of 12" Ductile Iron Watermain 330' of 16" Ductile Iron Watermain 650' of 20" O.D. HDPE Watermain (Horizontal Directional Drilled) 17 Copper Water Services Approximately 1,000 feet of roadway reconstruction Work also includes, but is not limited to, incidental storm sewer removal
- Status
- Closed
- Sector
- Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Seaport, Commercial
- Location
- Benton Harbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project primarily consists of furnishing all material and constructing the following approximate quantities: 1,600' of 12" Ductile Iron Watermain 330' of 16" Ductile Iron Watermain 650' of 20" O.D. HDPE Watermain (Horizontal Directional Drilled) 17 Copper Water Services Approximately 1,000 feet of roadway reconstruction Work also includes, but is not limited to, incidental storm sewer removal and replacement, verification of existing sanitary laterals, maintenance of traffic, and restorat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Benton Harbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Seaport, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
