Water System Improvements
Sector: Water Supply and Storage • Location: Goshen, Alabama, United States of America
Source: Dodge USA
Principal items of work include the following: Approximately 2,100 LF of 6" Class 200 PVC Water Main; 35 LF of 10" Steel Casing, Bored; 3 Fire Hydrant Assemblies; 500 SY of Asphalt Patching; 430 Tons of Asphalt Wearing Surface; 205 SF of Traffic Control Markings; and other related appurtenances.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Goshen, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Principal items of work include the following: Approximately 2,100 LF of 6" Class 200 PVC Water Main; 35 LF of 10" Steel Casing, Bored; 3 Fire Hydrant Assemblies; 500 SY of Asphalt Patching; 430 Tons of Asphalt Wearing Surface; 205 SF of Traffic Control Markings; and other related appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Goshen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
