Water System Looping Improvements
Closed · Ohio · Last reported Sep 2024
Source: Dodge USA
Design services for the construction of waterlines to loop the City's water distribution system. The project includes improving water quality and adding redundancy to the City's water distribution in the event emergency repairs. The project area are: 1) Along Airport Drive to Trease Road - engineering design and construction professional services; 2) Quadral Drive - preliminary engineering and cos
- Status
- Closed
- Sector
- Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Airport
- Location
- Wadsworth, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Looping Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design services for the construction of waterlines to loop the City's water distribution system. The project includes improving water quality and adding redundancy to the City's water distribution in the event emergency repairs. The project area are: 1) Along Airport Drive to Trease Road - engineering design and construction professional services; 2) Quadral Drive - preliminary engineering and cost estimates to loop the end of Quadral Drive. Up to four viable alignments shall be evaluated; an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Wadsworth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Airport |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
