logo

Water System Reliability Project to Start in Torrance

Sector: Metal • Location: San Jose, California, United States of America

Source: California Water Service

Project
Closed

Cal Water will start a water infrastructure upgrade in western Torrance on April 12 as part of the utility's commitment to ensuring critical infrastructure remains safe and reliable. The upgrade will ensure local customers and firefighters continue to have water for their everyday needs and in the event of an emergency. The utility plans to replace 860 feet of aging 6-inch cast-iron main with 8-in

Project Information FAQ

Project Information

4 Q
The project “Water System Reliability Project to Start in Torrance” is an infrastructure initiative in the Metal sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from California Water Service.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Cal Water will start a water infrastructure upgrade in western Torrance on April 12 as part of the utility's commitment to ensuring critical infrastructure remains safe and reliable. The upgrade will ensure local customers and firefighters continue to have water for their everyday needs and in the event of an emergency. The utility plans to replace 860 feet of aging 6-inch cast-iron main with 8-inch PVC pipe, as the existing main was installed more than 80 years ago and is nearing the end of its useful life. The increase in main diameter will also allow for increased water flow. Additionally, the utility plans to replace one fire hydrant and 27 existing customer service connections. Installation will take place along the 21300 block of Jaffrey Avenue and 900 block of W. 214th Street. The project is expected to be completed in May. "This important infrastructure upgrade will enable us to keep delivering the reliable supply of safe, high-quality water that Torrance residents have come to expect from Cal Water," said District Manager Dan Armendariz. "It will also ensure first responders have the water they need to protect the community in an emergency." Crews will work to minimize traffic delays and any other temporary inconvenience during construction, which will take place Monday through Friday between 8:30 a.m. and 3:30 p.m. Following installation, crews will conduct water quality testing and connect individual customer service connections to the new water main. Water service must be briefly interrupted as crews connect customer service connections to the main; however, Cal Water will notify residents in advance of any planned shutdowns, which are normally scheduled between 9 a.m. and 3:30 p.m. All streets, sod, and landscaping impacted by the construction will be restored to as close to the previous condition as possible.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data