Water System Resiliency - SCADA Modifications
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Water System Resiliency Project - SCADA Modifications 1075 Standpipe Electrical: Demolition of existing solar photovoltaic panels, batteries, and charge controllers. Provision of new solar photovoltaic panels, batteries, charge controllers, and enclosure. SCADA System: Replacement of existing Wonderware HMI with Inductive Automation Ignition HMI at the Water Treatment Plant and the Dies Booster St
- Status
- Closed
- Sector
- Energy Storage, Water Supply and Storage, Power Generation (CCGT), Solar, Government, Car parking, Automotive, Commercial, Waste Processing and Treatment
- Location
- Cedar Park, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water System Resiliency - SCADA Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water System Resiliency Project - SCADA Modifications 1075 Standpipe Electrical: Demolition of existing solar photovoltaic panels, batteries, and charge controllers. Provision of new solar photovoltaic panels, batteries, charge controllers, and enclosure. SCADA System: Replacement of existing Wonderware HMI with Inductive Automation Ignition HMI at the Water Treatment Plant and the Dies Booster Station. Upgrade and augmentation of PLC and RTU equipment throughout the water distribution system... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Cedar Park |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Water Supply and Storage, Power Generation (CCGT), Solar, Government, Car parking, Automotive, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
