Water System SCADA Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
To Construct SCADA, Controls, and RTU related equipment at 10 water and common infrastructure sites, and in addition construct the associated electrical requirements to implement a new radiobased SCADA System. The SCADA System will provide the Town s operations staff with the ability to monitor equipment and instrumentation, change operational modes and setpoints, provide limited control, and inte
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government
- Location
- Bethel, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water System SCADA Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To Construct SCADA, Controls, and RTU related equipment at 10 water and common infrastructure sites, and in addition construct the associated electrical requirements to implement a new radiobased SCADA System. The SCADA System will provide the Town s operations staff with the ability to monitor equipment and instrumentation, change operational modes and setpoints, provide limited control, and interrogate both process and equipment alarms. The contract shall also include the supply of a new FC... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Bethel |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
