logo
ProjectClosed

Water System Upgrades - Phases 1 2 & 3

Closed · Arizona · Last reported May 2023

Source: Dodge USA

The project is intended to be Bid in 3 phases.Phase 1 includes 2 Storage tanks, hydropneumatic tank, liquid chlorinator,booster stations, well equipping, 9,950 lf 6-inch PVC transmission main, Phase 2includes 23,500 4-inch & 25,200 lf of 6-inch PVC distribution waterline, Phase 3includes well equipping, tablet chlorinator, 16,900 lf 4-inch PVC transmissionmain and distribution waterlines, all with

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Residential
Location
Maricopa, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water System Upgrades - Phases 1 2 & 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water System Upgrades - Phases 1 2 & 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Maricopa, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is intended to be Bid in 3 phases.Phase 1 includes 2 Storage tanks, hydropneumatic tank, liquid chlorinator,booster stations, well equipping, 9,950 lf 6-inch PVC transmission main, Phase 2includes 23,500 4-inch & 25,200 lf of 6-inch PVC distribution waterline, Phase 3includes well equipping, tablet chlorinator, 16,900 lf 4-inch PVC transmissionmain and distribution waterlines, all with related appurtenances. Bids will bereceived for a single prime Contract.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Maricopa

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Residential

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project