Water System Upgrades
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Infrastructure Canada
The Project consists of replacing approximately 3,594 metres of drinking water pipes in the Town of Saint-Barthelemy, Quebec. The scope of the Project includes: 3,594 metres of drinking water pipes. The Ultimate Recipient will restore the road and landscaping on roadway sections extending over the 3,594 metres in question. This Project aims to maintain and upgrade drinking water distribution inf
- Status
- Closed
- Sector
- Water Supply and Storage, Road
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of replacing approximately 3,594 metres of drinking water pipes in the Town of Saint-Barthelemy, Quebec. The scope of the Project includes: 3,594 metres of drinking water pipes. The Ultimate Recipient will restore the road and landscaping on roadway sections extending over the 3,594 metres in question. This Project aims to maintain and upgrade drinking water distribution infrastructure. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
