logo

Water Transmission Line Replacement on East River East Side Road

Sector: Metal • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
Completed

1,240 metres of cast iron pipe dating back to 1940’s is a high priority to be replaced to improve the water transmission system. The reservoir cover will also be replaced as a result of the added stress and variance in the cover position.

Project Information FAQ

Project Information

5 Q
The project “Water Transmission Line Replacement on East River East Side Road” is an infrastructure initiative in the Metal sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

1,240 metres of cast iron pipe dating back to 1940’s is a high priority to be replaced to improve the water transmission system. The reservoir cover will also be replaced as a result of the added stress and variance in the cover position.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data