logo

Water Treatment Plant & PLC 5 Replacement

Sector: Water Supply and Storage • Location: High River, Alberta, Canada

Source: Dodge USA

Project
Bidding

The successful bidder will be required to supply, install and program a replacement PLC for the original PLC5. I/O checks and testing are required. Replacement PLC must be compatible with existing SLC5/05 PLC s in both the filter panel and Well control panel. The Water treatment plant must remain in operation while the PLC is being replaced. There will be short windows of down time available, Town

Status
Prospective
Sector
Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
Location
High River, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Treatment Plant & PLC 5 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Treatment Plant & PLC 5 Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in High River, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The successful bidder will be required to supply, install and program a replacement PLC for the original PLC5. I/O checks and testing are required. Replacement PLC must be compatible with existing SLC5/05 PLC s in both the filter panel and Well control panel. The Water treatment plant must remain in operation while the PLC is being replaced. There will be short windows of down time available, Town staff will be conducting day to day operations while the upgrade is underway. A line of communic...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

High River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project