Water Treatment Plant Repairs / Improvements
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The Water Treatment Plant (WTP) is core infrastructure and requires significant work to ensure the supply of safe drinking water. An on-going issue with our Influent/Effluent Valves must be repaired and our plant furnace is no longer operational, both items requiring a significant capital investment to repair. Additionally, the Ministry of the Environment (MOE) has identified that our SCADA system
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Water Treatment Plant (WTP) is core infrastructure and requires significant work to ensure the supply of safe drinking water. An on-going issue with our Influent/Effluent Valves must be repaired and our plant furnace is no longer operational, both items requiring a significant capital investment to repair. Additionally, the Ministry of the Environment (MOE) has identified that our SCADA system is not functioning 100% of the time, and must be replaced (non-compliant order). The MOE has also identified a trihalomethane (THM) issue that must be studied, and solutions presented to address this issue. The SCADA system will be replaced, and we will explore whether the existing system can be used as a back up to minimize the likelihood of loss of continuous data should the new system malfunction. A THM study will be conducted to identify alternate disinfectants to address our specific organics, and will include an estimate for Plant improvements to implement the recommended disinfectant process, as well as requirements for handling and storage, disinfection by-product formation and associated cost estimates. The study will also explore the possibility of removing THM precursors prior to disinfection. The Influent/Effluent Valves at the Plant will be replaced, and linked to the flow rate and chemical feed system to ensure full automation. The Plant’s furnace will be replaced with a high efficiency furnace. The generator’s expired fuel tank will be replaced with a larger tank to ensure adequate fuel is on hand for the generator to operate during power outages. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
