Water Treatment Plant Upgrades
Sector: Water Supply and Storage • Location: Clyde, New York, United States of America
Source: Dodge USA
WATER TREATMENT PLANT UPGRADES LABELLA PROJECT NO. 2240978 Contract. 1. Contract 1: General Construction Contract 2. Contract 2: Electrical Construction Contract 3. Contract 3: HVAC Construction Contract 4. Contract 4: Plumbing Construction Contract. The Project generally consists of construction of a new treatment plant (groundwater pump and treat system) which includes chemical storage and dosin
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Manufacturing (Industrial)
- Location
- Clyde, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Treatment Plant Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WATER TREATMENT PLANT UPGRADES LABELLA PROJECT NO. 2240978 Contract. 1. Contract 1: General Construction Contract 2. Contract 2: Electrical Construction Contract 3. Contract 3: HVAC Construction Contract 4. Contract 4: Plumbing Construction Contract. The Project generally consists of construction of a new treatment plant (groundwater pump and treat system) which includes chemical storage and dosing, operating room, and truck/bay storage area, site work, new submersible pump for Well #2, SCADA... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Clyde |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
