Water Utility Project No. 146
Sector: Water Supply and Storage • Location: Bismarck, North Dakota, United States of America
Source: Dodge
Work shall consist of approximately 250 LF of new water main to be bored, 9400 LF of watermain replacement by bursting, 50 gate valves, 20 hydrants, 160 water services, and related items.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Bismarck, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water Utility Project No. 146
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work shall consist of approximately 250 LF of new water main to be bored, 9400 LF of watermain replacement by bursting, 50 gate valves, 20 hydrants, 160 water services, and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bismarck |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
