Water Valve Replacement Phase 3
Sector: Water Supply and Storage • Location: Wainwright, Alberta, Canada
Source: Dodge USA
Wainwright - WR399943_CN76918 - Water Valve Replacement Phase 3 - The work includes, but is not necessarily limited to, the supply of labour, material, supervision and equipment necessary to replace select water main isolation valves and lines for the Department of National Defence (DND) at 3rd Canadian Division Support Base (3CDSB) Garrison Wainwright, Wainwright, Alberta.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Wainwright, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Valve Replacement Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Wainwright - WR399943_CN76918 - Water Valve Replacement Phase 3 - The work includes, but is not necessarily limited to, the supply of labour, material, supervision and equipment necessary to replace select water main isolation valves and lines for the Department of National Defence (DND) at 3rd Canadian Division Support Base (3CDSB) Garrison Wainwright, Wainwright, Alberta. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Wainwright |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
