logo

Waterford Sidewalk Replacement Phase 3

Sector: Government • Location: Waterford, Michigan, United States of America

Source: Dodge

Project
Closed

Waterford Sidewalk Replacement Phase 3,: The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Removal of approximately 2,096 square yards of sidewalk, and installation of approximately 30,784 square feet of concrete sidewalk, removal and replacement of approximately 933 square yards of HMA pathway, and ADA ramps along both sides of Elizabeth Lak

Status
Closed
Sector
Government, Cement, Commercial, Car parking, Automotive
Location
Waterford, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Waterford Sidewalk Replacement Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Waterford Sidewalk Replacement Phase 3” is an infrastructure initiative in the Government sector, located in Waterford, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Waterford Sidewalk Replacement Phase 3,: The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Removal of approximately 2,096 square yards of sidewalk, and installation of approximately 30,784 square feet of concrete sidewalk, removal and replacement of approximately 933 square yards of HMA pathway, and ADA ramps along both sides of Elizabeth Lake Rd and Pontiac Lake Rd.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Waterford

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Cement, Commercial, Car parking, Automotive

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project