Waterfront Stormline Relocation Phase 3
Sector: Water Supply and Storage • Location: Hood River, Oregon, United States of America
Source: Dodge USA
The work to be done under this contract consists of connecting to an existing 36-inch RCP stub out on Riverside Drive, installing 584 LF of 36-inch RCP east along Riverside Drive from the stub-out to a new 60-inch manhole in Riverside Drive, then installing 283 LF of 24-inch RCP east along Riverside Drive to a new 48-inch manhole in Riverside Drive, then installing 398 LF of 18-inch RCP east to a
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Hood River, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Waterfront Stormline Relocation Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done under this contract consists of connecting to an existing 36-inch RCP stub out on Riverside Drive, installing 584 LF of 36-inch RCP east along Riverside Drive from the stub-out to a new 60-inch manhole in Riverside Drive, then installing 283 LF of 24-inch RCP east along Riverside Drive to a new 48-inch manhole in Riverside Drive, then installing 398 LF of 18-inch RCP east to a new 48-inch manhole at the intersection of Riverside Drive and N 2nd Street; installing 264 LF of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hood River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
