Waterfront Transportation Assessment

Sector: Bridge • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Planning

Waterfront Transportation Assessment Share this: Facebook Twitter LinkedIn SFMTA.com/WTA Project Introduction Project overview The Waterfront Transportation Assessment (WTA) was a San Francisco Municipal Transportation Agency (SFMTA) led transportation and land use planning effort that began in late 2012.  Wrapped up in Summer 2015, the WTA was conceived as a evaluation that focused on the compreh

Project Information FAQ

Project Information

4 Q
The project “Waterfront Transportation Assessment” is an infrastructure initiative in the Bridge sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Waterfront Transportation Assessment Share this: Facebook Twitter LinkedIn SFMTA.com/WTA Project Introduction Project overview The Waterfront Transportation Assessment (WTA) was a San Francisco Municipal Transportation Agency (SFMTA) led transportation and land use planning effort that began in late 2012.  Wrapped up in Summer 2015, the WTA was conceived as a evaluation that focused on the comprehensive transportation network, in response to a series of similarly timed major development proposals along the waterfront, all which will depend on a safe and reliable transportation system to sustain them. The WTA included both qualitative and quantitative analyses.  It incorporated extensive stakeholder outreach, and entailed regular citywide and regional coordination. The WTA was a comprehensive planning process through which the SFMTA worked in close partnership the Planning Department, the Port, the Office of Economic and Workforce Development, the community, and development sponsors. In addition to being led by stakeholder input, the WTA was also guided by key city policies and lessons learned from past planning efforts. Phase 1: Transportation Goals & Strategies Phase 1 of WTA looked at the transportation network along the entire waterfront to understand how the study area is served by all modes, to identify existing deficiencies, and to conceive of strategies that could would serve current needs and address future demand.  It was governed by key city transportation policies that have been developed as part of multiple local and regional plans, including the San Francisco General Plan, the Central Waterfront Area / East SoMa Plan, the San Francisco Transportation Plan, the Port of San Francisco Waterfront Land Use Plan, the MTC Transportation 2035 Plan, the BART Strategic Plan, the WETA Transition Plan, the Caltrain Strategic Plan, and the BCDC Strategic Plan. It was guided by past planning projects, particularly the 34th America’s Cup People Plan , that set a precedent for transportation preparedness response to the episodic nature of waterfront destinations. The success of the People Plan in facilitating continuous multimodal transportation connections and preventing confusion and gridlock during one of the busiest event times in San Francisco was due namely to its transparent planning process, intradepartmental and regional coordination, and strategic multimodal transportation planning. Phase 2: Transportation Needs & Solutions Analysis Phase 2 was established to evaluate the transportation shortfalls in the waterfront transportation network, and to identify solutions to manage current and serve future transportation demand. The technical analysis was completed using advanced modeling tools by the SFCTA and their consultant. Phase 2 utilized a technical approach using travel demand corridors in San Francisco and regionally to identify a more holistic understanding of the root causes to transportation challenges in the waterfront. Understanding the root causes, allowed the WTA team to recommend transportation solutions. The WTA's technical analysis (Phase 2) asked: What would it take for the city to accommodate forecast increase in trips in 25 years in the SoMa/Mission Bay/Central Waterfront (Study Area)? And it offered 3 answers: Continue to develop and implement localized network improvements Advocate for full funding for critical transit capacity investments Pursue next steps to define promising new infrastructure and policy The Assessment: Developed smart partnerships with community stakeholders, local and regional transportation providers and project sponsors; Used lessons from America’s Cup; Considered timing of key planned transportation improvements; Developed preliminary Transportation Strategies in advance of major Project EIRs; and Conducted technical analysis to understand current and future demand, and to make recommendations to respond to that demand. Some of the Waterfront Transportation Assessment's "Strategies to Solutions" include: Mission Bay Could Have Ferry Service Come 2022 - Planning The Bay Bridge Approach Enforcement Pilot - Implentation The Embarcadero Enhancement Project - Funding The BART Embarcadero-Montgomery Capacity Improvement Study - Funding The Rincon Hill Transit Study - Implementation The 55 16th Street (interim 22 Fillmore) to Mission Bay - Implementation (Jan 2015) Relevant local & regional trasnportation planning: The SFMTA 5-Year Capital Improvement Program The SFMTA 2-Year Capital Budget San Francisco Bay Area Core Capacity Transit Study Community outreach: The Assessment included extensive outreach to stakeholders throughout the city in the form of transportation meetings, workshops, presentations and an Open House. Between 2011 and 2012, the SFMTA collected feedback from the community on transportation to create the “People Plan” for the America’s Cup event. The feedback from America's Cup translated into the initial outreach for the Waterfront Transportation Assessment kick-off meeting on October 30, 2012.  Since that meeting, the Waterfront Transportation Assesssment led and/or attended dozens of meetings with community stakeholders, development project stakeholders, advisory committees, advocacy groups, neighborhood and businsess associations, and homeowners associations. Please view past project meetings . ​Major Projects (partial list) Golden State Warriors’ Arena - Mission Bay SWL 337 & Pier 48 - Mission Rock Pier 70 Our Partners Our primary coordination and communications include a host of partnerships with community stakeholders, local and regional transportation providers and project sponsors. This list includes the Office of Economic and Workforce Development, The Port of San Francisco, The Planning Department, BART, Caltrain, WETA, MTC and various other community and project development partners. For More Information The Office of Community Investment and Infrastructure (OCII) - Mission Bay Office of Economic and Workforce Development (OEWD) - Warriors Mission Bay Pavillion San Francisco Planning Department:  Environmental Planning Port of SF Seawall Lot 337 & Pier 48 Mission Rock Port of SF Pier 70 Area SFMTA Transportation Demand Management Project Status Planning Bus Routes and Rail Lines F Market & Wharves J Church K Ingleside L Taraval (Suspended) M Ocean View N Judah T Third Street 9 San Bruno 9R San Bruno Rapid 10 Townsend (Suspended) 12 Folsom/Pacific 14 Mission 14R Mission Rapid 14X Mission Express (Suspended) 22 Fillmore 24 Divisadero 27 Bryant 30 Stockton 30X Marina Express (Suspended) 38 Geary 38R Geary Rapid 38AX Geary A Express (Suspended) 38BX Geary B Express (Suspended) 41 Union (Suspended) 44 O'Shaughnessy 45 Union/Stockton 47 Van Ness (Suspended) 48 Quintara/24th Street 82X Levi Plaza Express (Suspended)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data