Waterkant Wind Farm
Planned · Germany · Last reported Aug 2025
Source: Blackout News
The Waterkant wind farm was planned to install 19 Chinese wind turbines, each with an output of 15.5 megawatts, to enter the German offshore wind power market. However, the project has shifted to exclusively use turbines from Siemens Gamesa due to safety and geopolitical concerns.
- Status
- Prospective
- Sector
- Raw Materials, Power Generation (CCGT), Wind
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- Blackout News
ConstructChat
Ask ConstructChat about Waterkant Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Waterkant wind farm was planned to install 19 Chinese wind turbines, each with an output of 15.5 megawatts, to enter the German offshore wind power market. However, the project has shifted to exclusively use turbines from Siemens Gamesa due to safety and geopolitical concerns. |
Original sector | Energy |
Location
Country | Germany |
Source
Source | Blackout News |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
