WaterLine ADA Ramps & Road Improvement
Sector: Water Supply and Storage • Location: Escalon, California, United States of America
Source: Dodge USA
DESCRIPTION OF PROJECT The bids shall cover: Valdapena Way Waterline, ADA Ramps, & Road Improvement Plan, Between Riesling Way & Sanchez Way: consists of the abandonment of an existing 8 water line and the installation of a new PVC 8 water line within the Valdapena Way, Barbera Court and Muscat Court roadways. The existing water services, meters, and boxes shall be removed and reinstalled througho
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial
- Location
- Escalon, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WaterLine ADA Ramps & Road Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF PROJECT The bids shall cover: Valdapena Way Waterline, ADA Ramps, & Road Improvement Plan, Between Riesling Way & Sanchez Way: consists of the abandonment of an existing 8 water line and the installation of a new PVC 8 water line within the Valdapena Way, Barbera Court and Muscat Court roadways. The existing water services, meters, and boxes shall be removed and reinstalled throughout both sides of the roadways. The existing roadways shall have a 2 asphalt grind over the entire... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Escalon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
