Waterline Extension Contract 1
Sector: Water Supply and Storage • Location: Vicco, Kentucky, United States of America
Source: Dodge USA
Contract 1 will consist of the installation of 18,620 LF of 2 HDPE DR11, 12,980 LF of 3 HDPE DR11, and 5,200 LF of 4 HDPE Waterline and related appurtenances. Also included will be 230 LF of 3 HDPE DR9 and 2,520 LF of 2 HDPE DR9 Waterline via Horizontal Directional Drilling method as well as 570 LF of 2 HDPE DR9 via conventional jack & bore method with 6 steel casing. Two new hydropneumatic booste
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Steel, Raw Materials, Metal
- Location
- Vicco, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Waterline Extension Contract 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract 1 will consist of the installation of 18,620 LF of 2 HDPE DR11, 12,980 LF of 3 HDPE DR11, and 5,200 LF of 4 HDPE Waterline and related appurtenances. Also included will be 230 LF of 3 HDPE DR9 and 2,520 LF of 2 HDPE DR9 Waterline via Horizontal Directional Drilling method as well as 570 LF of 2 HDPE DR9 via conventional jack & bore method with 6 steel casing. Two new hydropneumatic booster pumps stations are also required. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Vicco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Steel, Raw Materials, Metal |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
