Waterline Replacement Phase II
Completed · Newfoundland and Labrador
Source: Infrastructure Canada
This project will replace 560 meters of plastic waterlines to service 9 houses on Main Road In Long Harbour-Mount Arlington Heights. The project aims to enable the system to withstand normal water pressure, reducing emergency repairs and reducing maintenance costs, thus ensuring the water system remains safe from contamination. We will start by replacing a section of the oldest (40+years old) HDPE
- Status
- Closed
- Sector
- Metal, Seaport, Water Supply and Storage, Road
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Waterline Replacement Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace 560 meters of plastic waterlines to service 9 houses on Main Road In Long Harbour-Mount Arlington Heights. The project aims to enable the system to withstand normal water pressure, reducing emergency repairs and reducing maintenance costs, thus ensuring the water system remains safe from contamination. We will start by replacing a section of the oldest (40+years old) HDPE plastic lines with ductile iron. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Metal, Seaport, Water Supply and Storage, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
