logo

Waterloo Landfill Gas Power Project

Sector: Commercial • Location: Waterloo, Ontario, Canada

Source: P3Spectrum, Canada

Project
Operational

Opportunity The Regional Municipality of Waterloo operates two landfill sites that receive 200,000 tonnes of waste year. Waterloo Landfill, the larger of the two, covers 72 hectares and currently has the capacity to operate for approximately 15 more years. In the 1990s there was increasing concern about the landfill’s smell, and the environmental impact of gases which is made up of approximately 5

Project Information FAQ

Project Information

5 Q
The project “Waterloo Landfill Gas Power Project” is an infrastructure initiative in the Commercial sector, located in Waterloo, Ontario, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity The Regional Municipality of Waterloo operates two landfill sites that receive 200,000 tonnes of waste year. Waterloo Landfill, the larger of the two, covers 72 hectares and currently has the capacity to operate for approximately 15 more years. In the 1990s there was increasing concern about the landfill’s smell, and the environmental impact of gases which is made up of approximately 50 per cent methane and 50 per cent carbon dioxide. As a first step, the Region built a well field and flaring system in 1995 at a total cost of $3 million. The second step was to find a partner that could use the landfill gases to generate power. Following an RFP process Toromont Energy—a market leader in designing, building and maintaining power generation plants—was selected as a partner to build an electrical generating station in 1998. Innovations The performance based contract specifies that the plant must be on-line 90 per cent of the time that the Region supplies gas to it or else Toromont has to pay royalties as if the plant was operating. Results The station originally generated 3.7 megawatts of power but was built with the capacity to increase production to eight megawatts when more engines are added to handle increased gas recovered from the landfill. Landfill gas emissions have been reduced by about 600 million cubic feet per year. In addition to reducing landfill gases emitted into the atmosphere, generating renewable energy reduces the reliance on non-renewable sources of energy such as natural gas. In 2013 approximately 3 million kilowatts of power was produced each month—enough to power between 4,000 and 6,000 homes. The power generating plant has been on-line 99 per cent of the time that it is supplied with gas. Landfill odours have been eliminated.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data