logo
ProjectClosed

Waterloo WWTP Scada Upgrades

Closed · Ontario · Last reported Aug 2025

Source: Dodge

Generally, without limiting the scope of the project, the work covered by this pre-qualification covers the following: Installation, testing, and commissioning support for temporary controls if required to support the site cut-over strategy Removal and disposal of existing equipment, including control panels, control stations, and junction boxes Receiving, delivery and set-up of materials on-site

Status
Closed
Sector
Water Supply and Storage, Education, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
Location
Waterloo, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Waterloo WWTP Scada Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Waterloo WWTP Scada Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Waterloo, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Generally, without limiting the scope of the project, the work covered by this pre-qualification covers the following: Installation, testing, and commissioning support for temporary controls if required to support the site cut-over strategy Removal and disposal of existing equipment, including control panels, control stations, and junction boxes Receiving, delivery and set-up of materials on-site as necessary General Site Safety Installation of new electrical equipment, including control pane...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Waterloo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Education, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project