logo

Watermain relining on Clairton Place

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The project includes the relining of approximately 400 metres of water main along Clairton Place in the Community of Amherstview, as well as the replacement of valves and fire hydrants associated with the system. The water main for this section of the Amherstview drinking water system includes 150mm and 250mm cast iron pipes that were installed in 1967. These lines service approximately 30 househo

Project Information FAQ

Project Information

4 Q
The project “Watermain relining on Clairton Place” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the relining of approximately 400 metres of water main along Clairton Place in the Community of Amherstview, as well as the replacement of valves and fire hydrants associated with the system. The water main for this section of the Amherstview drinking water system includes 150mm and 250mm cast iron pipes that were installed in 1967. These lines service approximately 30 households, several of which have complained about coloured water, indicating a need for this part of the system to be rehabilitated. This project is a local priority. The availability of the Clean Water and Wastewater Fund will allow for this project to proceed. Additional work included in this project: - required to relocate isolation valve from wet well to new valve chamber immediately adjacent to the wet well due to the restricted space in the existing wet well - added LED lights to the wet well and valve chamber - entrance hatch to the new valve chamber was a special order aluminum hatch for ease of ingress and egress - MBQ did not decommission the existing 100mm force main. It will be utilized as a bypass in the event repairs are required at the station. This required the addition of one (1) 100mm valve and one (1) 150mm valve.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data