logo

WaterPump StationsSouth Cobb Tunnel Pump Station

Sector: Commercial • Location: United States of America (USA)

Source: Walsh

Project
Completed

The project consisted of a 130-MGD lift station to convey wastewater flows from the tunnel to the plant, with six 32.5-MGD vertical non-clog centrifugal pumps in a conventional wet well/dry pit configuration. The lift station has a concentric cylinder configuration, with the inner cylinder functioning as the wet well and the dry well occupying the annular space between the outer cylinder and the w

Project Information FAQ

Project Information

5 Q
The project “WaterPump StationsSouth Cobb Tunnel Pump Station” is an infrastructure initiative in the Commercial sector, located in United States of America (USA). Taiyo aggregates data on it from Walsh.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consisted of a 130-MGD lift station to convey wastewater flows from the tunnel to the plant, with six 32.5-MGD vertical non-clog centrifugal pumps in a conventional wet well/dry pit configuration. The lift station has a concentric cylinder configuration, with the inner cylinder functioning as the wet well and the dry well occupying the annular space between the outer cylinder and the wet well exterior wall. Both the wet well and the dry well are divided into two bays. The wet well is provided with an odor control system, while the dry wells are provided with elevators, auxiliary pumps, and HVAC and dehumidification systems. An electrical building houses drives, starters, switchgear and plant equipment, along with an emergency standby generator and instrumentation and control systems. 130 A 130-MGD lift station conveys wastewater flows from the tunnel to the plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data